Future 113A
Planning Responsibly for the Future of SD113A
Strong schools are the heart of a strong community. As our school community continues to grow, Lemont-Bromberek Combined School District 113A continues to take a conservative and methodical approach to prepare for and address increasing enrollment. While we are grateful that so many families want to experience the excellent education District 113A provides, enrollment growth is exceeding expectations and further steps are needed to prepare for the future.
Over the past several years, SD113A has experienced record enrollment growth, driven by:
- Successful schools and community
- Turnover of existing homes to young families
- Migration from private and parochial schools
- New housing developments
Despite multiple planning efforts — including three demographic studies (2017, 2024, 2026) — actual enrollment has exceeded even the highest projections.

Ask a Question
Have a question about the limiting rate referendum and it challenges facing SD113A?
Submit your question via our Google Form
Navigate the Page
- Historic Growth
- Rising Enrollment. Limited Capacity.
- A Responsible Path Forward
- Frequently Asked Questions
Attend a Community Meeting to Learn More
Dr. Orzel and district leaders will be sharing information with the community at upcoming informational sessions that will be held in the Lemont Township Community Center.
- Monday, Aug. 31 – 9 a.m.
- Monday, Sept. 14 – 6 p.m.
- Tuesday, Oct. 6 – 6 p.m
Doing More With Less
District 113A operates with a lower tax rate and lower per-pupil spending than neighboring districts. Our challenges are not because of overspending.
The Cost of Educating a Student
It takes 3-4 average houses’ tax dollars to educate 1 student, and we have the lowest operational and instructional per pupil spending in the area.
Increasing Class Sizes
Though we've hired staff to maintain and lower class sizes, SD113A serves more students per class than the state average and neighboring districts.
Rising Enrollment. Limited Capacity.
A Commitment To High-Quality Learning Environments
District 113A is focused on a long-term funding solution that:
- Supports student growth and achievement
- Continues to provide safe, engaging learning environments
- Reduces/maintains class sizes, instructional programs, transportation, student support services, and extracurricular offerings
- Supports the recruitment and retention of high-quality teachers and staff
- Limits the impact on taxpayers
- Strengthens property values by maintaining quality schools
HOWEVER, as growth continues, we are seeing:
- Increasing class sizes
- Learning spaces repurposed (LRC and multipurpose rooms are now classrooms)
- Small group instruction occurring in hallways and corridors
- Staff and students sharing instructional spaces
District 113A has been responsibly planning for and managing increasing enrollment. Three enrollment studies were completed over the last 10 years (2017, 2024 and again in 2026) to continue to monitor growth.
Actual growth last year was more than 500 students over what was projected in 2017 and exceeded what was anticipated from the 2024 study.

Options Considered To Support Increasing Enrollment
To address current and future capacity needs, District 113A has evaluated short and long term facility expansion solutions including:
- Classroom additions at all existing schools
- Use of modular (temporary) classrooms
- Reclaiming district-owned facilities
- Building a new school
Steps Already Taken
SD113A has worked for years to manage growth:
- Reopened Central School
- Repurposed internal spaces (LRCs, shared rooms)
- Adjusted staffing to meet enrollment
- Explored reacquisition of district-owned property
- Conducted multiple demographic studies
- Participated in Village Technical Review Committee processes
- Acquired adjacent property to expand parking at Central

Planning a Responsible Path Forward
Frequently Asked Questions
A collection of questions about the proposal and the situation are below. Click on a question to reveal the answer.
Have a question that you don’t see? Use the Google Form to submit a question.
-
If the proposal is approved by voters, the district will be able to generate $6 million annually, giving the District the ability to create additional classroom spaces at each of our four schools while other funds will be used to staff, maintain, and support these additional classrooms in order to keep class sizes reasonable. The timeline for planning and construction would be developed quickly but could take up to two years to build the additions onto each building.
-
If the proposal is not approved, SD113A will continue to face challenges due to rapidly growing enrollment and space constraints. While the district values keeping class sizes reasonable, there would be a need to increase class sizes at most grade levels. The district would also have to make decisions around potential programming cuts in order to have more dedicated classrooms. Additionally, larger spaces in the schools like Library Resource Centers or dedicated specials’ classrooms may need to be transformed into general education classrooms with those programs either becoming mobile (on carts) or being eliminated.
-
The financial challenges District 113A faces today are not the result of overspending. Compared with peer districts, District 113A operates with a lower tax rate, lower per-pupil spending, and lower State funding, clear evidence of long-standing fiscal discipline and careful resource management. Many peer districts have tax rates significantly higher than District 113A’s, receive substantially more State Evidence-Based Funding per student, and spend significantly more per pupil each year, underscoring the District’s sustained commitment to fiscal responsibility.
Tax Rate Comparison

Lemont-Bromberek CSD 113A 1.968 Downers Grove GSD 58 2.237 Hinsdale CCSD 181 2.465 Center Cass SD 66 2.610 CCSD 180 2.704 Palos 128 2.851 Maercker SD 60 2.921 Cass SD 63 2.930 Will County SD 92 2.9388 Palos CCSD 118 3.037 Homer CCSD 33C 3.653 North Palos SD 117 3.925 Woodridge SD 68 3.9486 CCSD 146 4.580 Lisle CUSD 202 4.862 Many peer districts have tax rates up to 45% higher than District 113A’s, receive substantially more State Evidence-Based Funding per student, and spend at least 30% more per pupil each year, underscoring the District’s sustained commitment to fiscal responsibility.

Per Pupil Spending Comparison
113A $8,054 Homer 33C $8,879 Cass SD 63 $9,459 Maercker SD 60 $9,916 Palos 118 $9,961 Center Cass 66 $10,078 Palos 128 $10,279 North Palos 117 $10,375 Darien SD 61 $10,601 Gower SD 62 $10,936 DG 58 $11,096 Woodridge SD 68 $11,733 State $11,785 Will County SD 92 $12,486 Hinsdale 181 $14,066 Lisle SD 202 $14,788 Burr Ridge 180 $15,050 -
In Illinois education, the "limiting rate" is the maximum property tax rate a school district can levy for funds subject to the Property Tax Extension Limitation Law (PTELL). It acts as a revenue control mechanism, capping a district's annual property tax extensions to the lesser of 5% or the rate of inflation (CPI).
-
District 113A is considering placing a limiting rate referendum on the November 2026 ballot. If approved, the limiting rate increase would generate an estimated $6,000,000 annually.

-
SD113A has proactively worked to manage growth:
- Reopened Central School in 2022
- Repurposed internal spaces (LRCs, shared rooms)
- Adjusted staffing to meet increasing enrollment
- Explored reacquiring district-owned property
- Conducted multiple demographic studies
- Participated in Village Technical Review Committee processes
- Acquired adjacent property to expand parking at Central
-
To address current and future capacity needs, SD113A has evaluated short and long term facility expansion solutions including:
- Classroom additions at all existing schools
- Use of modular (temporary) classrooms
- Reclaiming district-owned facilities
- Building a new school
-
We currently do not have any available classroom space at our four schools to be able to handle the anticipated enrollment increase.
-
SD113A is a good steward of taxpayer dollars, and when facing challenges with space, opted for the most cost-effective solution for facilities, which is adding onto current buildings. We considered building a new building; however, the cost was the highest of the options. Additionally, other districts have utilized a similar option and found that enrollment numbers didn’t increase to those levels, resulting in school closures, which we want to avoid for our taxpayers.
Our facilities were built to last and are well-maintained, but the challenges of simply not having enough space to serve our growing student population require the district to look into other options. Additionally, by proposing this type of proposal, the district is ensuring that not only will we create extra spaces, but we will have the funds to staff those spaces and keep class sizes reasonable while maintaining our commitment to excellence in programming.
-
Yes. SD113A is partnering with architects to determine the priorities for this proposal which will include renderings of planned additions and renovations. There is not a need to purchase additional land at this time, but the district is closely watching properties around schools with future growth in mind.
-
The District planned in 2021 to reopen Central School with the intention of reducing class sizes as enrollment increased. That goal was achieved.
The building construction provided for 27 classrooms (includes classrooms for Art, Music, and STEM). Currently, the building has 582 students enrolled, and every classroom is filled. We have an additional section in fourth grade that we had to take a multi-purpose room and convert it into a classroom due to the additional need of a class section in 2024-25. We have another section from 3rd to 4th that will require us to consider using an art, music or stem lab to accommodate another classroom, which in turn, will put one of these Encore classes on a cart for instructional purposes.
Since that time, the district has seen 300 more students enroll into the district, and the district has taken measured, conservative approaches to continue to reduce and/or maintain class sizes while continuing to monitor increasing enrollment. The district has engaged in three enrollment studies, the most recent in 2026, to gauge variables such as fertility rates, existing home sales and developments.
The district is not looking to build a new school to accommodate the increasing enrollment. While that is an option, that is the most costly option of $65-70 million + that the district does not have and doesn’t believe will solve the problem. Instead, additions to each building would provide a reasonable solution to the increasing enrollment problem.